This project is undoubtedly one of the largest we have undertaken to date. We designed and manufactured 57 modular rooms, with a gross surface area of 3000 m2, for three combined cycle power plants in Bolivia, with a total gross power output of 1.2 GW:

                 -Termoeléctrica de Warnes, which is located near Warnes (Santa Cruz).

-Termoeléctrica del Sur, which is located near Yaguacua (Yacuiba).

-Termoeléctrica de Entre Ríos, which is located near Entre Ríos (Cochabamba).

 Designed under strict seismic parameters and to withstand extremely adverse weather conditions.

The rooms were equipped with HVAC and fire protection and suppression systems in accordance with local regulations. In addition, they included the following equipment: batteries, LV Switchgears, inverters, rectifiers, UPS…

A solution designed to be suitable for transport by road and sea. They were tried and tested in the factory, resulting in significant savings in on-site assembly.

In addition, our technicians travelled to Bolivia to provide technical assistance during the assembly and commissioning of the various phases of the project, thus always providing the customer with the support needed.

Customer

TSK

Year

2017 - 2018

Country

BOLIVIA

Square meters built